1.Cut off a vertical line on the side of insulation sleeve
2.Sizing on both sections and then cohere after 5~10 minutes
3. Pull hard to make every part connect completely and seamlessly
4. Sizing on both sides to adhere two insulation sleeves completely
***Length of insulation sleeves must be long enough to adhere completely. After that, use insulation tapes (3 thk x 25 wide) to wrap up connecting area.
DOUBLE LAYERS INSTALLATION
1. Construction of Double Layers of Insulation Sleeves
2. Use Aluminum Foil (colored) or other Metal Jackets to wrap up Insulation Sleeves, better not to wrap them by tapes only.
3. Remain enough space between two Insulation Sleeves.
CONSTRUCTION OF ELBOW
CONSTRUCTION OF TEE AND VALVE
CONSTRUCTION OF CHILLING WATER PIPELINES IN AIR CONDITIONING SYSTEM